Las obras del túnel del Canal en Dover: Bajando en la jaula; Llegada al fondo del pozo; Swindon Junction; Máquina perforadora de aire comprimido; Sección del túnel, de 'The Illustrated London News', 4(The Channel Tunnel Works at Dover: Going Down in the Cage; Arrival at the Bottom of the Shaft; Swindon Junction; Compressed Air-Boring Machine; Section of Tunnel, from 'The Illustrated London News', 4)English School |
€ 140.94
Enthält 21% MwSt.
|
1882 · Gravur
· Imagen de ID: 96774
Private Collection / Bridgeman Images |
0 Opiniones |